Maicasagi Bridge
Maicasagi, Québec
An innovative approach was required to provide a structure capable of traversing such a wide river. Creating a box-beam structure using cross-laminated timber webs screwed to structural glued-laminated timber beams enables this 68 m long span to handle very heavy loads.
Owner
Structure
Groupe Stavibel, Nordic Structures
Span
67.4 m
Load
180 t custom truck, CF3E-140t
Completion
2011

